** SEAL COATING STARTS 8/20 **
Posted on Aug 18th, 2018
Asphalt seal coating is scheduled to start on Monday 8/20. All vehicles in Section A of the diagram below must be out by 8AM. See also the handout left at units and linked below. This area includes all of Squires Gate, the dumpster road and Knightsbridge from the dumpster road to the front of building 12 and Unit 11A. It is required that there be no parking or vehicle travel in this section until the next day.