2024 Pool Project & Video Link
Removal of old pool facilities and new pool installation. Demolition started 2/5/2024.
 
Videos 1080p HD are available here.
 
2/6 Excavator Hydraulic Breaker
Separating rebar from concrete
2/7 Deck demolished
2/8 Debris removal
Removal of poor ground base
2/9
2/10 Extra gravel added
Perimiter lower for footing
Rear of Clubhouse
2/11
2/15 Snow
2/19 Prep for shell backing
2/20
Dual main drains set
Backing and skimmers placed
Some ground water in deep end
Flex PVC for ground water
2/22 Rebar install day
Rebar 8" on center
Steps
Bricks to position rebar
2/26 Through wall piping
2/27 Gunite shoot day
Forming steps
2/29, Rain 2/28
3/2 Rain
3/3 After night of rain
3"- 5" Deep end pooling
3/4
3/5 Rain
3/6
3/7 After night of heavy rain
3/8 Green from concrete
3/10
3/12 Back filling sides
Bonding rebar locations (5)
Trench for pipes
3/14
3/18
Base for piping
Rear walk removed
Pump room
Rock has to go
3/19 Return piping
3/20
Pressure test setup
Small pipe for ground water
3/25 Start of tile install
3/26
Mercedes Blue
3/27 Rain
3/28 Tile grouting
3/29
Step edge tile
4/1 5ft depth tile line install
Gravel backfilling of piping
4/2 Rain
4/5 Coping install
Old pumps & filters removed
4/6
4/8 Copings done and grouted
4/9
4/12 Concrete cut back
4/18 Grading
Caulking
4/19
Pump room
4/21 Ground water level
4/23 Deck gravel
4/24 Concrete forms, drains
Plaster color choice
4/25 Pour Day 1
New pump & filter
4/26 Deck completed
Pool shell prep for plastering
4/27 Saw cutting control joints
4/29 Plaster Day
6 Truck loads needed
5/1
Pump room
5/8 Color coded piping
5/21 Visitor
Stump under old deck
6/13 New fence install
6/16 New fence & gate
6/20 Chlorine tanks, pad
6/25 New lawn prep
Leader ground pipe repair
6/26 Restoration, leader drain
6/27
Sod installed
7/3 Controller w/WiFi
Drain to sanitary line
7/8 Flow meter
Acid tank (Pink)
Chlorine tanks (Yellow)
Fill line spout
7/15 Emergency Switch, Outlet
Trespassers, humanly released
7/21 Chlorine tank enclosure
7/22 Entrance gate
7/23 Controller w/Probe Line
8/9 Chlorine delivery
9/18 Safety cover install
Skimmer line blow out
Main drains blow out